8/13/2008

Today, work will be done. Am not too worried about E3B, except for Laplace, since I think I've been rather consistent. What worries me is MF. At least we have 6 days to be gratified.
I still feel like a bastard after saying 'Praise the Lord' to Alvin, when clearly, it was mean to do so.
Fortunately, he took it in his stride, and said that it was probably to warn him about a bigger wave coming his way, and thus, to prepare for it.

Whatever it is, here are some photos, mostly overdue.Here showing what Norman+Marcian+Sean+Myself did instead of going for maths. Notice that Its been a week plus since this photo was taken, so Marcian's Proj. Nutz scars are still scabby and visible. The 2nd game we played, I was feeling a little impatient, so I yanked out the side tiles on the lowest rung. Sean took out the 2 sides from the next level, and so, the Hands-of-a-surgeon wannabe eventually lost it, maybe on purpose.






This is the bike thats been sitting around in my place, collecting dust, size 9 US sandal to allow for size comparison. The frame is fine, but I really cannot tell if it's triple butted Cr-Mo Steel like the 10+ yr old sticker says, because it really, really, really, feels like aluminium, 'cause it's rather light compared to the black steel shimano avanti sitting around collecting dust too.

Anyway, I'm hoping to repair this baby (at <$250) by 20th Sept, and start riding round. I know that the cassette and chain-ring need to be changed, no thanks to a certain step fellow's abrupt gear shifting. Maybe thats why the company van is so screwed too, maybe it it wasn't the fellow's employee who messed up the van gears.